Best practice report – Operation and Maintenance requirements. Deliverable 3.6.3 from the MERiFIC Project

Mise à jour : 20 mars 2014
0
impact de l'énergie sur l'environnement
infrastructure
source d'énergie renouvelable
énergie houlomotrice

This report is a deliverable of MERiFIC Work Package 3.6: ‘Operation and Maintenance requirements’ and has been produced as a cross border collaboration between IFREMER and the University of Exeter. The report provides an overview of guidelines and recommendations for the management of O&M operations necessary for an optimal exploitation of Marine energy plants, with a focus on the specific areas of South West Cornwall, UK and Iroise sea, Brittany, France. An overview of the onshore infrastructures and ports possibly suitable for management of such O&M operations is also provided. Management of scheduled and unscheduled maintenance operations are discussed in their various aspects including site accessibility. It should be noted that this topic, including weather window assessment for operations is discussed in more detail in the additional MERIFIC report D3.6.2: Best Practice for installation procedures.

Notice détaillée

Best practice report – Operation and Maintenance requirements. Deliverable 3.6.3 from the MERiFIC Project
Type de document
Rapport
Auteurs personnes
Weller, Samuel
Johanning, Lars
Maisondieu, Christophe
Éditeur
Institut français de recherche pour l'exploitation de la mer (IFREMER)
Date de parution
20 mars 2014
Langue
Anglais